At the end of July 2021, Sunnyrack another Radio Shuttle Racking Project finished final installation and debugging. The user of the project is a medical technology enterprise in Nantong, Jiangsu Province (preparing for listing).
The warehouse is L20*W32*H12(m), and about half of the warehouse area is planned to be used for the racking system;
The specifications of pallets in use are L1200*W1000(mm) and L1200* W1100(mm), with a load of 600kg/Pallet. The categories are divided into 4-5 categories, 8 hours per day and 500 pallets/day;
After the comprehensive evaluation and discussion with the customer, the radio shuttle racking system was finally selected.
After the completion of the project implementation, it finally meets the expected needs of customer: 1. With the area of the existing half warehouse, it has realized the storage of 3782 pallet locations, meeting the production planning needs in the next 3-5 years; 2. Equipped with 6 radio shuttles; 3. Equipped with 2 sets of three-way 9.5m gantry forward moving forklifts, plus height address recognition and wireless visual system.